- Copyright 2024. Homeone Singapore. All right reserved.
The Ariston P 15 Punggol Central HDB project is mandatory to comply with Section 40G of the Public Utilities Act 2001, which requires all storage installations to be submitted to the Public Utilities Board (PUB) for an Acknowledgment of Authorized Heater Replacement. This ensures that the installation meets all relevant regulations and standards, providing peace of mind regarding the safety of the installation. By complying with this requirement your storage water heater installation is authorized and safe to use. Let PUB ensure that your installation meets all necessary requirements and protects you.
Work Scope
1. Supply of tank, pipe and fittings
2. Removal of old tank
3. Pipe works partial redo to comply PUB
4. New tank installation
5. Testing and commission. Submission to PUB
6. Clean up before leaving
7. PUB approval letter
Reason for the Replacement: End of service life
Our licensed water service plumber has ensured that work is done in accordance with the conditions stated below: