We’re #1 Official Installation Partner
Rheem Storage Water Heater
The No.1 American Water Heater Brand in Singapore
An American company with nearly 100 years in business, Rheem has been a pioneer in developing some of the most innovative advancements in water heating. With a long list of award-winning solutions, Rheem continues to deliver advanced comfort, savings, and experiences to the customers.
Since 1st April 2018, the installation or replacement of an electric storage heater must be carried out or supervised by a PUB Licensed Plumber.
INSTALLATIONS
We have done replacement and installation for more than 5,000 Rheem storage water heaters.
Across different singapore households like Condominium, HDB, Apartment and also landed houses.
Rubine MT-30 water heater replacement with Rheem EHG-30 storage water heater at Whitewater on 23 Mar 2024
Rheem EH-100M storage water heater replacement with Rheem EHG-50 storage water heater at a landed house at Westwood Avenue on 23 May 2024
AOS15 Gallon Horizontal replacement with Rheem EHG-40 storage water heater at a commercial building at Balestier Road on 25 April 2024
Looking to replace your water heater?
Look through our best selling water heaters listing for a good recommendation!
Recent water heater installations
Our Projects
1 King Albert Park
Completion Year: 1997
Total Unit: 101
Floor: NA
Model: Rheem 65SVP15S
Piping: PPR
3 Orchard By-The-Park
Completion Year: 2017
Total Unit: 77
Floor: 25
Model: Rheem EHG-80
Piping: PPR
Adam Park Condominium
Completion Year: 2004
Total Unit: 118
Floor: 5
Model: Rheem EP15-H
Piping: to update
Amaranda Gardens
Completion Year: 2004
Total Unit: 187
Floor: 17
Model: Rheem EHG-40M
Piping: to update
Ardmore Park
Completion Year: 2001
Total Unit: 330
Floor: NA
Model: Rheem 85VP20S
Piping: Copper
Ballota Park Condo
Completion Year: 2000
Total Unit: 365
Floor: 8
Model: Rheem 65SVP10S
Piping: Copper
Banyan Condo
Completion Year: 1995
Total Unit: 104
Floor: 4
Model: Rheem 65SVP10S
Piping: Copper
Bartley Residences
Completion Year: 2015
Total Unit: 702
Floor: 17
Model: Rheem EH-55M
Piping: PPR
Bayshore Park
Completion Year: 1986
Total Unit: 1093
Floor: 32
Model: to updateÂ
Piping: to update
Beacon Heights
Completion Year: 2012
Total Unit: 212
Floor: 28
Model: Rheem EH-40MÂ
Piping: to update
Bishan Park Condo
Completion Year: 1994
Total Unit: 320
Floor: 10
Model: Rheem 85VP6S
Piping: Copper
Blu Coral Condo
Completion Year: 2011
Total Unit: 79
Floor: 5
Model: Rheem EH-40MÂ
Piping: to update
Butterworth 8
Completion Year: 2004
Total Unit: 216
Floor: 18
Model: Rheem EP15-H
Piping: Copper
Cairnhill Crest
Completion Year: 2004
Total Unit: 248
Floor: 18
Model: Rheem EP15-H
Piping: Copper
Camelot By The Water
Completion Year: 2001
Total Unit: 99
Floor: 20
Model: Rheem 85VP20S
Piping: Copper
Caribbean at Keppel Bay
Completion Year: 2004
Total Unit: 969
Floor: 10
Model: Rheem EP15-H
Piping: to update
Carissa Park Condo
Completion Year: 2003
Total Unit: 528
Floor: 8
Model: Rheem 85VP6S & 65SVP15S
Piping: to update
Casa Pasir Ris
Completion Year: 2000
Total Unit: 224
Floor: 4
Model: Rheem 65SVP10S
Piping: to update
Casafina
Completion Year: 2000
Total Unit: 224
Floor: 4
Model: Rheem 85VP6S
Piping: Copper
Cashew Heights
Completion Year: 1992
Total Unit: 596
Floor: NA
Model: Rheem 85VP6S
Piping: Copper
Castle Green
Completion Year: 1997
Total Unit: 664
Floor: 13
Model: Rheem 85VP6S
Piping: Copper
Century Woods
Completion Year: 2002
Total Unit: 99
Floor: NA
Model: Rheem 65SVP15S
Piping: PPR
Chiltern Park
Completion Year: 1995
Total Unit: 500
Floor: 10
Model: Rheem 85VP6S
Piping: to update
Clementi Park
Completion Year: 1985
Total Unit: 489
Floor: 10
Model: Rheem 85VP6S
Piping: to update
Corals at Keppel Bay
Completion Year: 2016
Total Unit: 336
Floor: 10
Model: Rheem EHG-40
Piping: PPR
Corona Ville
Completion Year: 1982
Total Unit: 41
Floor: NA
Model: Rheem 65SVP15S
Piping: to update
Dahlia Park Condo
Completion Year: 2004
Total Unit: 299
Floor: 8
Model: Rheem 85VP6S
Piping: to update
Double Bay Residences
Completion Year: 2012
Total Unit: 646
Floor: 13
Model: Rheem EH40M
Piping: to updat
Dover Parkview
Completion Year: 1997
Total Unit: 686
Floor: 16
Model: Rheem 65SVP10S
Piping: to update
Eastpoint Green
Completion Year: 1998
Total Unit: 684
Floor: 10
Model: Rheem 85VP20S
Piping: Copper
Edelweiss Park Condo
Completion Year: 2006
Total Unit: 517
Floor: 8
Model: Rheem EH-25M
Piping: PPR
Elizabeth Tower
Completion Year: 1980
Total Unit: 80
Floor: NA
Model: Rheem 65SVP10S
Piping: to update
Estella Gardens
Completion Year: 1999
Total Unit: 350
Floor: 8
Model: Rheem EH-40M
Piping: to update
Euphony Gardens
Completion Year: 2002
Total Unit: 304
Floor: 4
Model: Rheem 65SVP10S
Piping: Copper
Ferraria Park Condo
Completion Year: 2010
Total Unit: 475
Floor: 8
Model: Rheem EH-55M
Piping: to update
Finland Gardens
Completion Year: 1989
Total Unit: 48
Floor: NA
Model: Rheem 85VP6S
Piping: Copper
Goldenhill Park Condo
Completion Year: 2010
Total Unit: 475
Floor: 8
Model: Rheem EHG-40
Piping: Stainless Steel
Grange Residences
Completion Year: 2004
Total Unit: 164
Floor: 18
Model: Rheem EP-20H
Piping: to update
Guilin View
Completion Year: 2000
Total Unit: 655
Floor: 30
Model: Rheem 65SVP10S
Piping: Copper
Hazel Park
Completion Year: 2000
Total Unit: 696
Floor: 19
Model: Rheem EH-40M
Piping: to update
Hedges Park Condominium
Completion Year: 2015
Total Unit: 501
Floor: 8
Model: Rheem EH-55M
Piping: to update
Heritage View
Completion Year: 2000
Total Unit: 618
Floor: 20
Model: Rheem EHG-30
Piping: Copper
High Park Residences
Completion Year: 2000
Total Unit: 618
Floor: 20
Model: Rheem EHG-60
Piping: to update
Hillbrooks
Completion Year: 1999
Total Unit: 299
Floor: 10
Model: Rheem 65SVP10S & 65SVP15S
Piping: to update
Hillcrest Arcadia
Completion Year: 1980
Total Unit: 272
Floor: NA
Model: Rheem 65SVP10S
Piping: PPR
Hillview Green
Completion Year: 1998
Total Unit: 400
Floor: 10
Model: Rheem 61SVP15S
Piping: Copper
Hillview Park
Completion Year: 1995
Total Unit: 184
Floor: NA
Model: Rheem 65SVP10S
Piping: to update
Horizon Towers
Completion Year: 1984
Total Unit: 210
Floor: 18
Model: Rheem 85VP20S
Piping: to update
Hume Park II
Completion Year: 1997
Total Unit: 328
Floor: 10
Model: Rheem 65SVP10S
Piping: to update
J Gateway
Completion Year: 2017
Total Unit: 738
Floor: 38
Model: Rheem EH-40M
Piping: to update
KAP Residences
Completion Year: 2017
Total Unit: 142
Floor: 7
Model: Rheem EHG-30 & EHG-60
Piping: PPR
Kingsford Waterbay
Completion Year: 2018
Total Unit: 1165
Floor: NA
Model: Rheem EHG-40
Piping: PPR
Kovan Regency
Completion Year: 2016
Total Unit: 393
Floor: 14
Model: Rheem EHG-50
Piping: to update
Lake Grande
Completion Year: 2020
Total Unit: 710
Floor: NA
Model: Rheem EHG-60
Piping: to update
Landridge Condo
Completion Year: 1993
Total Unit: 72
Floor: 3
Model: Rheem 85VP6S
Piping: to update
Leonie Gardens
Completion Year: 1993
Total Unit: 138
Floor: NA
Model: Rheem 65SVP10S
Piping: to update
Mandalay Towers
Completion Year: 1974
Total Unit: 56
Floor: NA
Model: Rheem 65SVP10S
Piping: to update
Maysprings
Completion Year: 1998
Total Unit: 636
Floor: 24
Model: Rheem 65SVP10S
Piping: Copper
Merawoods
Completion Year: 1999
Total Unit: 305
Floor: 10
Model: Rheem 65SVP10S
Piping: to update
Mirage Tower
Completion Year: 1997
Total Unit: 248
Floor: 33
Model: Rheem 65SVP10S
Piping: to update
Montview
Completion Year: 2008
Total Unit: 115
Floor: 24
Model: Rheem EH-55MÂ
Piping: to update
Mount Sophia Suites
Completion Year: 2011
Total Unit: 50
Floor: NA
Model: Rheem EH-75M
Piping: PPR
Nineteen Shelford
Completion Year: 1997
Total Unit: 256
Floor: 10
Model: Rheem 85VP6S
Piping: Copper
Norht Park Residences
Completion Year: 2018
Total Unit: 920
Floor: NA
Model: Rheem EH-55M
Piping: PPR
Northvale
Completion Year: 1998
Total Unit: 762
Floor: 12
Model: Rheem 65SVP15S
Piping: to update
One Chatsworth
Completion Year: 1976
Total Unit: 45
Floor: NA
Model: Rheem 85VP20S
Piping: PPR
Orange Grove Residences
Completion Year: 2009
Total Unit: 60
Floor: 5
Model: Rheem EH-25M
Piping: PPR
OUE Twin Peaks
Completion Year: 2015
Total Unit: 462
Floor: 36
Model: Rheem EH-40M
Piping: to update
Palm Galleria
Completion Year: 2010
Total Unit: 40
Floor: NA
Model: Rheem EH-40M
Piping: PPR
Palm Mansion
Completion Year: 1998
Total Unit: 30
Floor: 5
Model: Rheem 61SVP15S
Piping: Copper
Parc Oasis
Completion Year: 1995
Total Unit: 950
Floor: NA
Model: Rheem 65SVP10S
Piping: Copper
Parc Rosewood
Completion Year: 2014
Total Unit: 689
Floor: NA
Model: Rheem 65SVP10S
Piping: Copper
Parc Riviera
Completion Year: 2000
Total Unit: 234
Floor: 7
Model: Rheem EHG-40
Piping: Copper
Park Infinia at Wee Nam
Completion Year: 2008
Total Unit: 486
Floor: 31
Model: Rheem EH-40M
Piping: to update
Pinehurst Condo
Completion Year: 2008
Total Unit: 486
Floor: 31
Model: Rheem 85VP6S
Piping: to update
Pinevale
Completion Year: 2000
Total Unit: 322
Floor: NA
Model: Rheem EHG-30
Piping: Stainless Steel
Poets Villas
Completion Year: 2015
Total Unit: 40
Floor: 1
Model: Rheem EH-40M
Piping: Stainless Steel
Reflections at Keppel Bay
Completion Year: 2013
Total Unit: 1129
Floor: 40
Model: Rheem EH-75M
Piping: PPR
Regent Residences
Completion Year: 2016
Total Unit: 180
Floor: 26
Model: Rheem EH-40M
Piping: to update
Residences @ Evelyn
Completion Year: 2007
Total Unit: 208
Floor: 33
Model: Rheem 65SVP15S
Piping: to update
Ris Grandeur
Completion Year: 2006
Total Unit: 453
Floor: 17
Model: Rheem EH-40M
Piping: to update
Sea Avenue Residences
Completion Year: 2006
Total Unit: 30
Floor: 5
Model: Rheem EH-55M
Piping: to update
Seaside Residences
Completion Year: 2021
Total Unit: 841
Floor: 27
Model: Rheem EHG-40
Piping: PPR
Seletaris​
Completion Year: 2001
Total Unit: 328
Floor: 4
Model: Rheem 65SVP10S & 65SVP10S
Piping: Copper
Sims Urban Oasis
Completion Year: 2017
Total Unit: 1024
Floor: NA
Model: Rheem EH-40M
Piping: PPR
Simsville
Completion Year: 1998
Total Unit: 522
Floor: 16
Model: Rheem 65SVP15S
Piping: to update
Sky Green
Completion Year: 2016
Total Unit: 176
Floor: 15
Model: Rheem EH-55M
Piping: Stainless Steel
Southbank
Completion Year: 2009
Total Unit: 197
Floor: 39
Model: Rheem 85VP6S, EH-40M & EH-55M
Piping: PPR
Stratford Court
Completion Year: 2000
Total Unit: 268
Floor: 4
Model: Rheem 85VP6SÂ
Piping: Copper
Springdale Condo
Completion Year: 2000
Total Unit: 480
Floor: 10
Model: Rheem 61SVP15S
Piping: Copper
Stratum
Completion Year: 2016
Total Unit: 380
Floor: 5
Model: Rheem 85VP6S
Piping: to update
Studio8
Completion Year: 2014
Total Unit: 35
Floor: NA
Model: Rheem EH-40M
Piping: to update
Symphony Heights
Completion Year: 1998
Total Unit: 449
Floor: 10
Model: Rheem 81VP10S
Piping: Copper
Tan Tong Meng Tower
Completion Year: 1977
Total Unit: 35
Floor: 18
Model: Rheem EH-25MÂ
Piping: Copper
The Anchorage
Completion Year: 1997
Total Unit: 775
Floor: 19
Model: Rheem 65SVP10SÂ
Piping: Copper
The Ansley
Completion Year: 2004
Total Unit: 100
Floor: 25
Model: Rheem EHG-50Â Â
Piping: StainlessÂ
The Balmoral
Completion Year: 1986
Total Unit: 81
Floor: 8
Model: Rheem 65SVP15S
Piping: to update
The Bayshore
Completion Year: 1996
Total Unit: 1038
Floor: 30
Model: Rheem 85VP6S
Piping: Stainless Steel
The Blossomvale
Completion Year: 1999
Total Unit: 220
Floor: 8
Model: Rheem 65SVP15S
Piping: to update
The Boulevard Residence
Completion Year: 2005
Total Unit: 46
Floor: 36
Model: Rheem 65SVP15S
Piping: to update
The Clearwater
Completion Year: 2017
Total Unit: 469
Floor: 23
Model: Rheem 65SVP15S
Piping: Copper
The Coast at Sentosa Cove
Completion Year: 2010
Total Unit: 249
Floor: 8
Model: Rheem EH-40M
Piping: PPR
The Crest
Completion Year: 2017
Total Unit: 469
Floor: 23
Model: Rheem EH-40M
Piping: to update
The Dairy Farm
Completion Year: 1989
Total Unit: 477
Floor: 9
Model: Rheem EH-25S
Piping: to update
The Estuary @ Yishun
Completion Year: 2013
Total Unit: 608
Floor: 17
Model: Rheem EH-40M
Piping: PPR
The Florentine
Completion Year: 2011
Total Unit: 34
Floor: NA
Model: Rheem EH-40M
Piping: Copper
The Foliage
Completion Year: 2008
Total Unit: 88
Floor: 5
Model: Rheem EH-55M
Piping: to update
The Glades
Completion Year: 2017
Total Unit: 726
Floor: NA
Model: Rheem EH-40M & 86H-40
Piping: PPR
The Grandhill
Completion Year: 2007
Total Unit: 53
Floor: 5
Model: Rheem EH-25 & EH-40M
Piping: Copper
The Hillside
Completion Year: 2001
Total Unit: 340
Floor: 10
Model: Rheem 81VP6S & 85VP6S
Piping: Copper
The Interweave
Completion Year: 2015
Total Unit: 169
Floor: 21
Model: Rheem EH-25M
Piping: Copper
The Lakefront Residences
Completion Year: 2014
Total Unit: 629
Floor: 17
Model: Rheem EH-55M
Piping: PPR
The Makena
Completion Year: 1998
Total Unit: 504
Floor: 28
Model: Rheem 61SVP10S
Piping: to update
The Peak @ Balmeg
Completion Year: 2011
Total Unit: 180
Floor: 5
Model: Rheem EH-75M & EH-40M
Piping: PPR
The Quintet
Completion Year: 2006
Total Unit: 459
Floor: NA
Model: Rheem EH-40M
Piping: Copper
The Sail @ Marina Bay
Completion Year: 2008
Total Unit: 1111
Floor: 69
Model: Rheem EH-40M, EH-55M
Piping: PPR
The Scala @ Lorong Chuan
Completion Year: 2013
Total Unit: 468
Floor: 17
Model: Rheem EHG-25S
Piping: PPR
The Terrace
Completion Year: 2018
Total Unit: 747
Floor: NA
Model: Rheem 65H-56
Piping: to update
The Trevose
Completion Year: 2001
Total Unit: 142
Floor: NA
Model: Rheem 85VP6S
Piping: to update
The Trilinq
Completion Year: 2017
Total Unit: 755
Floor: 36
Model: Rheem EH-40M
Piping: to update
The Woodgrove
Completion Year: 1998
Total Unit: 72
Floor: NA
Model: Rheem 61SVP10S
Piping: Copper
Trellis Towers
Completion Year: 2000
Total Unit: 384
Floor: 30
Model: Rheem 65SVP10S
Piping: Copper
Trevose Park
Completion Year: 1991
Total Unit: 150
Floor: 5
Model: Rheem 85VP6S
Piping: to update
Varsity Park Condominium
Completion Year: 2008
Total Unit: 530
Floor: NA
Model: Rheem EH-55M
Piping: Copper
Ventuno Balomar
Completion Year: 2009
Total Unit: 35
Floor: 11
Model: Rheem EH-40M
Piping: Copper
Versilia On Haig
Completion Year: 2010
Total Unit: 128
Floor: 18
Model: Rheem EH-55M
Piping: Copper
Woodsvale
Completion Year: 2000
Total Unit: 696
Floor: 15
Model: Rheem EH-40M
Piping: PPR
Windy Heights
Completion Year: 1978
Total Unit: 200
Floor: 14
Model: Rheem 85VP6S
Piping: Copper
Woodgrove Condo
Completion Year: 1999
Total Unit: 248
Floor: 4
Model: Rheem 65SVP15S
Piping: to update
Yishun Emerald
Completion Year: 2002
Total Unit: 436
Floor: 16
Model: Rheem 65SVP10S
Piping: to update
Our Projects
1 King Albert Park
Completion Year: 1997
Total Unit: 101
Floor: NA
Model: Rheem 65SVP15S
Piping: PPR
3 Orchard By-The-Park
Completion Year: 2017
Total Unit: 77
Floor: 25
Model: Rheem EHG-80
Piping: PPR
Adam Park Condominium
Completion Year: 2004
Total Unit: 118
Floor: 5
Model: Rheem EP15-H
Piping: to update
Amaranda Gardens
Completion Year: 2004
Total Unit: 187
Floor: 17
Model: Rheem EHG-40M
Piping: to update
Ardmore Park
Completion Year: 2001
Total Unit: 330
Floor: NA
Model: Rheem 85VP20S
Piping: Copper
Ballota Park Condo
Completion Year: 2000
Total Unit: 365
Floor: 8
Model: Rheem 65SVP10S
Piping: Copper
Banyan Condo
Completion Year: 1995
Total Unit: 104
Floor: 4
Model: Rheem 65SVP10S
Piping: Copper
Bartley Residences
Completion Year: 2015
Total Unit: 702
Floor: 17
Model: Rheem EH-55M
Piping: PPR
Bayshore Park
Completion Year: 1986
Total Unit: 1093
Floor: 32
Model: to updateÂ
Piping: to update
Beacon Heights
Completion Year: 2012
Total Unit: 212
Floor: 28
Model: Rheem EH-40MÂ
Piping: to update
Bishan Park Condo
Completion Year: 1994
Total Unit: 320
Floor: 10
Model: Rheem 85VP6S
Piping: Copper
Blu Coral Condo
Completion Year: 2011
Total Unit: 79
Floor: 5
Model: Rheem EH-40MÂ
Piping: to update
Butterworth 8
Completion Year: 2004
Total Unit: 216
Floor: 18
Model: Rheem EP15-H
Piping: Copper
Cairnhill Crest
Completion Year: 2004
Total Unit: 248
Floor: 18
Model: Rheem EP15-H
Piping: Copper
Camelot By The Water
Completion Year: 2001
Total Unit: 99
Floor: 20
Model: Rheem 85VP20S
Piping: Copper
Caribbean at Keppel Bay
Completion Year: 2004
Total Unit: 969
Floor: 10
Model: Rheem EP15-H
Piping: to update
Carissa Park Condo
Completion Year: 2003
Total Unit: 528
Floor: 8
Model: Rheem 85VP6S & 65SVP15S
Piping: to update
Casa Pasir Ris
Completion Year: 2000
Total Unit: 224
Floor: 4
Model: Rheem 65SVP10S
Piping: to update
Casafina
Completion Year: 2000
Total Unit: 224
Floor: 4
Model: Rheem 85VP6S
Piping: Copper
Cashew Heights
Completion Year: 1992
Total Unit: 596
Floor: NA
Model: Rheem 85VP6S
Piping: Copper
Castle Green
Completion Year: 1997
Total Unit: 664
Floor: 13
Model: Rheem 85VP6S
Piping: Copper
Century Woods
Completion Year: 2002
Total Unit: 99
Floor: NA
Model: Rheem 65SVP15S
Piping: PPR
Chiltern Park
Completion Year: 1995
Total Unit: 500
Floor: 10
Model: Rheem 85VP6S
Piping: to update
Clementi Park
Completion Year: 1985
Total Unit: 489
Floor: 10
Model: Rheem 85VP6S
Piping: to update
Corals at Keppel Bay
Completion Year: 2016
Total Unit: 336
Floor: 10
Model: Rheem EHG-40
Piping: PPR
Corona Ville
Completion Year: 1982
Total Unit: 41
Floor: NA
Model: Rheem 65SVP15S
Piping: to update
Dahlia Park Condo
Completion Year: 2004
Total Unit: 299
Floor: 8
Model: Rheem 85VP6S
Piping: to update
Double Bay Residences
Completion Year: 2012
Total Unit: 646
Floor: 13
Model: Rheem EH40M
Piping: to updat
Dover Parkview
Completion Year: 1997
Total Unit: 686
Floor: 16
Model: Rheem 65SVP10S
Piping: to update
Eastpoint Green
Completion Year: 1998
Total Unit: 684
Floor: 10
Model: Rheem 85VP20S
Piping: Copper
Edelweiss Park Condo
Completion Year: 2006
Total Unit: 517
Floor: 8
Model: Rheem EH-25M
Piping: PPR
Elizabeth Tower
Completion Year: 1980
Total Unit: 80
Floor: NA
Model: Rheem 65SVP10S
Piping: to update
Estella Gardens
Completion Year: 1999
Total Unit: 350
Floor: 8
Model: Rheem EH-40M
Piping: to update
Euphony Gardens
Completion Year: 2002
Total Unit: 304
Floor: 4
Model: Rheem 65SVP10S
Piping: Copper
Ferraria Park Condo
Completion Year: 2010
Total Unit: 475
Floor: 8
Model: Rheem EH-55M
Piping: to update
Finland Gardens
Completion Year: 1989
Total Unit: 48
Floor: NA
Model: Rheem 85VP6S
Piping: Copper
Goldenhill Park Condo
Completion Year: 2010
Total Unit: 475
Floor: 8
Model: Rheem EHG-40
Piping: Stainless Steel
Grange Residences
Completion Year: 2004
Total Unit: 164
Floor: 18
Model: Rheem EP-20H
Piping: to update
Guilin View
Completion Year: 2000
Total Unit: 655
Floor: 30
Model: Rheem 65SVP10S
Piping: Copper
Hazel Park
Completion Year: 2000
Total Unit: 696
Floor: 19
Model: Rheem EH-40M
Piping: to update
Hedges Park Condominium
Completion Year: 2015
Total Unit: 501
Floor: 8
Model: Rheem EH-55M
Piping: to update
Heritage View
Completion Year: 2000
Total Unit: 618
Floor: 20
Model: Rheem EHG-30
Piping: Copper
High Park Residences
Completion Year: 2000
Total Unit: 618
Floor: 20
Model: Rheem EHG-60
Piping: to update
Hillbrooks
Completion Year: 1999
Total Unit: 299
Floor: 10
Model: Rheem 65SVP10S & 65SVP15S
Piping: to update
Hillcrest Arcadia
Completion Year: 1980
Total Unit: 272
Floor: NA
Model: Rheem 65SVP10S
Piping: PPR
Hillview Green
Completion Year: 1998
Total Unit: 400
Floor: 10
Model: Rheem 61SVP15S
Piping: Copper
Hillview Park
Completion Year: 1995
Total Unit: 184
Floor: NA
Model: Rheem 65SVP10S
Piping: to update
Horizon Towers
Completion Year: 1984
Total Unit: 210
Floor: 18
Model: Rheem 85VP20S
Piping: to update
Hume Park II
Completion Year: 1997
Total Unit: 328
Floor: 10
Model: Rheem 65SVP10S
Piping: to update
J Gateway
Completion Year: 2017
Total Unit: 738
Floor: 38
Model: Rheem EH-40M
Piping: to update
KAP Residences
Completion Year: 2017
Total Unit: 142
Floor: 7
Model: Rheem EHG-30 & EHG-60
Piping: PPR
Kingsford Waterbay
Completion Year: 2018
Total Unit: 1165
Floor: NA
Model: Rheem EHG-40
Piping: PPR
Kovan Regency
Completion Year: 2016
Total Unit: 393
Floor: 14
Model: Rheem EHG-50
Piping: to update
Lake Grande
Completion Year: 2020
Total Unit: 710
Floor: NA
Model: Rheem EHG-60
Piping: to update
Landridge Condo
Completion Year: 1993
Total Unit: 72
Floor: 3
Model: Rheem 85VP6S
Piping: to update
Leonie Gardens
Completion Year: 1993
Total Unit: 138
Floor: NA
Model: Rheem 65SVP10S
Piping: to update
Mandalay Towers
Completion Year: 1974
Total Unit: 56
Floor: NA
Model: Rheem 65SVP10S
Piping: to update
Maysprings
Completion Year: 1998
Total Unit: 636
Floor: 24
Model: Rheem 65SVP10S
Piping: Copper
Merawoods
Completion Year: 1999
Total Unit: 305
Floor: 10
Model: Rheem 65SVP10S
Piping: to update
Mirage Tower
Completion Year: 1997
Total Unit: 248
Floor: 33
Model: Rheem 65SVP10S
Piping: to update
Montview
Completion Year: 2008
Total Unit: 115
Floor: 24
Model: Rheem EH-55MÂ
Piping: to update
Mount Sophia Suites
Completion Year: 2011
Total Unit: 50
Floor: NA
Model: Rheem EH-75M
Piping: PPR
Nineteen Shelford
Completion Year: 1997
Total Unit: 256
Floor: 10
Model: Rheem 85VP6S
Piping: Copper
Norht Park Residences
Completion Year: 2018
Total Unit: 920
Floor: NA
Model: Rheem EH-55M
Piping: PPR
Northvale
Completion Year: 1998
Total Unit: 762
Floor: 12
Model: Rheem 65SVP15S
Piping: to update
One Chatsworth
Completion Year: 1976
Total Unit: 45
Floor: NA
Model: Rheem 85VP20S
Piping: PPR
Orange Grove Residences
Completion Year: 2009
Total Unit: 60
Floor: 5
Model: Rheem EH-25M
Piping: PPR
OUE Twin Peaks
Completion Year: 2015
Total Unit: 462
Floor: 36
Model: Rheem EH-40M
Piping: to update
Palm Galleria
Completion Year: 2010
Total Unit: 40
Floor: NA
Model: Rheem EH-40M
Piping: PPR
Palm Mansion
Completion Year: 1998
Total Unit: 30
Floor: 5
Model: Rheem 61SVP15S
Piping: Copper
Parc Oasis
Completion Year: 1995
Total Unit: 950
Floor: NA
Model: Rheem 65SVP10S
Piping: Copper
Parc Rosewood
Completion Year: 2014
Total Unit: 689
Floor: NA
Model: Rheem 65SVP10S
Piping: Copper
Parc Riviera
Completion Year: 2000
Total Unit: 234
Floor: 7
Model: Rheem EHG-40
Piping: Copper
Park Infinia at Wee Nam
Completion Year: 2008
Total Unit: 486
Floor: 31
Model: Rheem EH-40M
Piping: to update
Pinehurst Condo
Completion Year: 2008
Total Unit: 486
Floor: 31
Model: Rheem 85VP6S
Piping: to update
Pinevale
Completion Year: 2000
Total Unit: 322
Floor: NA
Model: Rheem EHG-30
Piping: Stainless Steel
Poets Villas
Completion Year: 2015
Total Unit: 40
Floor: 1
Model: Rheem EH-40M
Piping: Stainless Steel
Reflections at Keppel Bay
Completion Year: 2013
Total Unit: 1129
Floor: 40
Model: Rheem EH-75M
Piping: PPR
Regent Residences
Completion Year: 2016
Total Unit: 180
Floor: 26
Model: Rheem EH-40M
Piping: to update
Residences @ Evelyn
Completion Year: 2007
Total Unit: 208
Floor: 33
Model: Rheem 65SVP15S
Piping: to update
Ris Grandeur
Completion Year: 2006
Total Unit: 453
Floor: 17
Model: Rheem EH-40M
Piping: to update
Sea Avenue Residences
Completion Year: 2006
Total Unit: 30
Floor: 5
Model: Rheem EH-55M
Piping: to update
Seaside Residences
Completion Year: 2021
Total Unit: 841
Floor: 27
Model: Rheem EHG-40
Piping: PPR
Seletaris​
Completion Year: 2001
Total Unit: 328
Floor: 4
Model: Rheem 65SVP10S & 65SVP10S
Piping: Copper
Sims Urban Oasis
Completion Year: 2017
Total Unit: 1024
Floor: NA
Model: Rheem EH-40M
Piping: PPR
Simsville
Completion Year: 1998
Total Unit: 522
Floor: 16
Model: Rheem 65SVP15S
Piping: to update
Sky Green
Completion Year: 2016
Total Unit: 176
Floor: 15
Model: Rheem EH-55M
Piping: Stainless Steel
Southbank
Completion Year: 2009
Total Unit: 197
Floor: 39
Model: Rheem 85VP6S, EH-40M & EH-55M
Piping: PPR
Stratford Court
Completion Year: 2000
Total Unit: 268
Floor: 4
Model: Rheem 85VP6SÂ
Piping: Copper
Springdale Condo
Completion Year: 2000
Total Unit: 480
Floor: 10
Model: Rheem 61SVP15S
Piping: Copper
Stratum
Completion Year: 2016
Total Unit: 380
Floor: 5
Model: Rheem 85VP6S
Piping: to update
Studio8
Completion Year: 2014
Total Unit: 35
Floor: NA
Model: Rheem EH-40M
Piping: to update
Symphony Heights
Completion Year: 1998
Total Unit: 449
Floor: 10
Model: Rheem 81VP10S
Piping: Copper
Tan Tong Meng Tower
Completion Year: 1977
Total Unit: 35
Floor: 18
Model: Rheem EH-25MÂ
Piping: Copper
The Anchorage
Completion Year: 1997
Total Unit: 775
Floor: 19
Model: Rheem 65SVP10SÂ
Piping: Copper
The Ansley
Completion Year: 2004
Total Unit: 100
Floor: 25
Model: Rheem EHG-50Â Â
Piping: StainlessÂ
The Balmoral
Completion Year: 1986
Total Unit: 81
Floor: 8
Model: Rheem 65SVP15S
Piping: to update
The Bayshore
Completion Year: 1996
Total Unit: 1038
Floor: 30
Model: Rheem 85VP6S
Piping: Stainless Steel
The Blossomvale
Completion Year: 1999
Total Unit: 220
Floor: 8
Model: Rheem 65SVP15S
Piping: to update
The Boulevard Residence
Completion Year: 2005
Total Unit: 46
Floor: 36
Model: Rheem 65SVP15S
Piping: to update
The Clearwater
Completion Year: 2017
Total Unit: 469
Floor: 23
Model: Rheem 65SVP15S
Piping: Copper
The Coast at Sentosa Cove
Completion Year: 2010
Total Unit: 249
Floor: 8
Model: Rheem EH-40M
Piping: PPR
The Crest
Completion Year: 2017
Total Unit: 469
Floor: 23
Model: Rheem EH-40M
Piping: to update
The Dairy Farm
Completion Year: 1989
Total Unit: 477
Floor: 9
Model: Rheem EH-25S
Piping: to update
The Estuary @ Yishun
Completion Year: 2013
Total Unit: 608
Floor: 17
Model: Rheem EH-40M
Piping: PPR
The Florentine
Completion Year: 2011
Total Unit: 34
Floor: NA
Model: Rheem EH-40M
Piping: Copper
The Foliage
Completion Year: 2008
Total Unit: 88
Floor: 5
Model: Rheem EH-55M
Piping: to update
The Glades
Completion Year: 2017
Total Unit: 726
Floor: NA
Model: Rheem EH-40M & 86H-40
Piping: PPR
The Grandhill
Completion Year: 2007
Total Unit: 53
Floor: 5
Model: Rheem EH-25 & EH-40M
Piping: Copper
The Hillside
Completion Year: 2001
Total Unit: 340
Floor: 10
Model: Rheem 81VP6S & 85VP6S
Piping: Copper
The Interweave
Completion Year: 2015
Total Unit: 169
Floor: 21
Model: Rheem EH-25M
Piping: Copper
The Lakefront Residences
Completion Year: 2014
Total Unit: 629
Floor: 17
Model: Rheem EH-55M
Piping: PPR
The Makena
Completion Year: 1998
Total Unit: 504
Floor: 28
Model: Rheem 61SVP10S
Piping: to update
The Peak @ Balmeg
Completion Year: 2011
Total Unit: 180
Floor: 5
Model: Rheem EH-75M & EH-40M
Piping: PPR
The Quintet
Completion Year: 2006
Total Unit: 459
Floor: NA
Model: Rheem EH-40M
Piping: Copper
The Sail @ Marina Bay
Completion Year: 2008
Total Unit: 1111
Floor: 69
Model: Rheem EH-40M, EH-55M
Piping: PPR
The Scala @ Lorong Chuan
Completion Year: 2013
Total Unit: 468
Floor: 17
Model: Rheem EHG-25S
Piping: PPR
The Terrace
Completion Year: 2018
Total Unit: 747
Floor: NA
Model: Rheem 65H-56
Piping: to update
The Trevose
Completion Year: 2001
Total Unit: 142
Floor: NA
Model: Rheem 85VP6S
Piping: to update
The Trilinq
Completion Year: 2017
Total Unit: 755
Floor: 36
Model: Rheem EH-40M
Piping: to update
The Woodgrove
Completion Year: 1998
Total Unit: 72
Floor: NA
Model: Rheem 61SVP10S
Piping: Copper
Trellis Towers
Completion Year: 2000
Total Unit: 384
Floor: 30
Model: Rheem 65SVP10S
Piping: Copper
Trevose Park
Completion Year: 1991
Total Unit: 150
Floor: 5
Model: Rheem 85VP6S
Piping: to update
Varsity Park Condominium
Completion Year: 2008
Total Unit: 530
Floor: NA
Model: Rheem EH-55M
Piping: Copper
Ventuno Balomar
Completion Year: 2009
Total Unit: 35
Floor: 11
Model: Rheem EH-40M
Piping: Copper
Versilia On Haig
Completion Year: 2010
Total Unit: 128
Floor: 18
Model: Rheem EH-55M
Piping: Copper
Woodsvale
Completion Year: 2000
Total Unit: 696
Floor: 15
Model: Rheem EH-40M
Piping: PPR
Windy Heights
Completion Year: 1978
Total Unit: 200
Floor: 14
Model: Rheem 85VP6S
Piping: Copper
Woodgrove Condo
Completion Year: 1999
Total Unit: 248
Floor: 4
Model: Rheem 65SVP15S
Piping: to update
Yishun Emerald
Completion Year: 2002
Total Unit: 436
Floor: 16
Model: Rheem 65SVP10S
Piping: to update
Rheem Online Shop
-
Rheem EHG 25S 25L Electric Storage Water Heater
Rheem EHG25S 25L Electric Storage Water Heater Design for HDB, BTO to installation$220.00 -
Rheem EHG 30L Electric Storage Water Heater
Rheem EHG 30L Rheem EHG 30L # 1 Safety Replacement & Installation in$240.00 -
Rheem EHG 40L Electric Storage Water Heater
Rheem EHG 40L Electric Storage Water Heater Storage Water Heater Replacement or Installation$260.00 -
Rheem EHG 40S 40L Electric Storage Water Heater
Rheem EHG 40S 40L Electric Storage Water Heater Replacement or Installation Below Ceiling$260.00 -
Rheem EH 75M Electric Storage Water Heater
Singapore Safety #1 PUB Licensed Replacement, Installation & Repair Suitable for above 8,$390.00 -
Rheem EH 55M Electric Storage Water Heater
Singapore Safety #1 PUB Licensed Replacement, Installation & Repair Suitable for above 5$350.00 -
Rheem EH 40M Electric Storage Water Heater
Singapore Safety #1 PUB Licensed Replacement, Installation & Repair Suitable for 4 to$320.00 -
Rheem EHG 50L Electric Storage Water Heater
Rheem EHG 50L Electric Storage Water Heater Replacement or Installation Below Ceiling Bundle$280.00
What are the warranty periods for Rheem water heaters?
- Rheem Xwell Series (XC & XS) (Warranty: 8 years for inner tank, 2 years for spare parts)
- Rheem EHG Series (Warranty: 5 years for inner tank, 1 year for spare parts)
- Rheem RCY Series (Warranty: 5 years for inner tank, 1 year for spare parts)
- Rheem EH-M Series (Warranty: 3 years for linner tank, 1 year for spare parts)
- Rheem Vertical Tank VP Series (Warranty: 3 years for inner tank, 1 year for spare parts)
Our Homeone service includes an engineering warranty for parts and labour. The leak-proof warranty is provided by the manufacturer.
What are the lifespans of Rheem water heaters?
You can expect the average lifespan of each series of Rheem water heaters to exceed the manufacturer’s warranty by more than 3 years. Here’s how long each series typically lasts:
- Rheem Xwell Series (XC & XS): Typically lasts around 11 years.
- Rheem EHG Series: Typically lasts around 8 years.
- Rheem RCY Series and Rheem RCY-30: Typically lasts around 8 years.
- Rheem EH-M Series: Typically lasts around 6 years.
- Rheem Vertical Tank VP Series: Typically lasts around 6 years.
Why is my Rheem water heater not heating water?
If you own a Rheem electric water heater and you do not have hot water, check the breaker to check if it has tripped unexpectedly. If it has, reset the circuit, and your water heater should continue to operate normally. If there were no power disturbances, the heating element may be at fault.
Why is my Rheem water heater tripping the circuit breaker?
There are several reasons why your Rheem water heater may be tripping the circuit breaker:
- Faulty Thermostat or Heating Element: A malfunctioning thermostat or heating element can cause the water heater to overheat, which can trip the circuit breaker as a safety measure.
- Incorrect Wire Size: Using wires that are not the correct size for the water heater can lead to overheating of the wires, which can also trip the breaker.
- Illegal Power Source Usage: Sharing the water heater’s power source with another load can overload the circuit, causing the breaker to trip.
- Faulty Junction Box, Isolator: A malfunctioning junction box can lead to electrical faults that trip the breaker. If the isolator switch is faulty, it can cause power surges or interruptions, leading to tripping.
- Malfunctioning Rheem Water Heater Switch: A faulty heater switch can result in intermittent electrical connections, which can trip the breaker.
What are the most common causes of noises in a Rheem water heater?
- High Water Pressure: High Water Pressure: Excessively high water pressure can cause pipes and the water heater to make noise, including a phenomenon known as water hammer.
- Loose Pipe Connections: If the pipes connected to the water heater are not properly secured, they can rattle or vibrate, especially when water flows through them.