20 Jul 2024

HDB Aircon Installation- Mitsubishi System1, MUY-GP18VF at 183D Boon Lay Avenue on 17 Jul 2024

The customer wishes to install a Mitsubishi brand System 1 air conditioner.
All installations are carried out by our BCA-trained aircon installers, ensuring compliance with BCA regulations.
Homeone provides a one-year engineering warranty for Mitsubishi Aircon System 1.
Manufacturer warranty
for Mitsubishi Aircon System 1.
Our Homeone installation service includes the submission of the necessary HDB Aircon Installation Submission Form AC-02.
Our service guarantees that all installations adhere to HDB safety standards, providing a reliable and compliant solution for your air conditioning needs.

  • Project location

    183D Boon Lay Avenue

  • Property type

    HDB

HDB Aircon Installation - Before & After

HDB Aircon Installation – Mitsubishi System1

Condensing Unit (CU) Model: MUY-GP18VF

Fan Coil Unit (FCU) Model: MSY-GP18VF

HDB Aircon Installation Job Scopes:

  1. Site Inspection and Planning

    To begin the air conditioner installation, assess the area to determine the optimal locations for both indoor and outdoor units.
    Measure and mark the positions for mounting, ensuring accuracy and level alignment.
    This step requires a tape measure, marker, and level to guarantee precise placement and secure installation.

  1. Mounting the Indoor Unit

    Secure the mounting plate to the wall by first drilling holes for the plate and pipes.
    Use screws and wall anchors to firmly attach the plate, ensuring it is level and stable.
    A drill, screws, wall anchors, level, and stud finder are essential tools for this task to ensure a strong and accurate installation.
    HDB Aircon Installation - Mounting the Indoor unit FCU

  1. Creating a Hole for the Piping

    Drill a hole through the wall for refrigerant pipes, the drain pipe, and power cables using a drill with a hole saw attachment.
    A drill, screws, wall anchors, level, and stud finder are essential tools for this task to ensure a strong and accurate installation.

  2. Preparing the Refrigerant Piping

    Cut the pipes to the required length, flare the ends, and connect them to the indoor unit.
    These steps ensure the proper fit and secure connection for optimal system performance.
    And run trunking for the refrigerant pipes.

    HDB Aircon Installation - Preparing Trunking

  3. Installing the Outdoor Unit

    Position the outdoor unit on an aircon ledge, and secure it with mounting brackets or bolts.
    If there is no aircon ledge in the HDB or the existing ledge lacks sufficient space, a bracket must be installed for the outdoor unit.
    This bracket must comply with BCA technical requirements.
    Use wrenches for fastening to ensure a stable and secure installation.
    HDB Aircon Installation- After installation of outdoor condensing unit

  4. Connecting the Electrical Wires

    Connect the wires from the indoor unit to the outdoor unit, ensuring proper grounding and secure connections.
    Ensure the wire size for the air conditioning connections is 2.5mm, and use a 20A isolator for the Mitsubishi System 1.
    Use wire strippers, screwdrivers, and a multimeter for accurate and safe electrical work.

    HDB Aircon Installation - Connecting the electrical wire

  5. Connecting the Refrigerant Piping

    Connect the pipes from the indoor unit to the outdoor unit, ensuring all connections are secure and leak-free.
    Use adjustable wrenches, a pipe wrench, and a leak detector to check and tighten connections.
    A brazing machine may also be needed for precise fitting and sealing.
    HDB aircon installation - Brazing for the Refrigerant Piping

  6. Sealing the Hole and Insulating the Pipes

    Seal the hole in the wall to prevent air and water ingress, and insulate the refrigerant pipes to avoid condensation.
    Use insulation tape and gun for effective sealing and insulation.

  7. Vacuuming the Lines and Charging the System

    Use a vacuum pump to remove air and moisture from the refrigerant lines before charging the system with the correct refrigerant.
    Employ a pressure gauge set, refrigerant scale, and the appropriate refrigerant for accurate and efficient system charging.

  8. Testing the System

    Power on the system and verify its operation, testing for cooling efficiency while listening for any unusual noises or vibrations.
    Use a thermometer, pressure gauge, and multimeter to ensure proper performance and troubleshoot any issues.
    HDB Aircon Installation - Testing the System

  9. Documentation and Cleanup

    After testing all connections and fittings, document the process, including the amount of refrigerant charged.
    Ensure all tools are collected and the work area is left clean.
    HDB Aircon Installation - Submission Form - 17 Jul 2024

 

Our Aircon Services

  1. System Analysis

  2. Refrigerant renewal

  3. Refrigerant pipe leak repair

  4. Condenser Unit Alkaline Wash

  5. Alkaline Wash with FCU Component Removal

  6. Alkaline Wash without FCU Component Removal

  7. FCU Essential Servicing

 

Condo Name: 183D Boon Lay Avenue

Read More About Us

Homeone Home Page

Homeone Aircon Page

Shop

Portfolio

Services

Blogs

About Us

Contact Us

Our Services

#Storage Water Heater

#Rheem

#Joven 

#Ariston 

#Gas Heater

#Paloma

#Ferroli

#Rinnai

#Aircon Services

Follow our Social Media

#FaceBook

#YouTube

Got A Question?

Feel free to reach out to us, if you have any enquiries

Log Out

Are you sure want to log out?
preloader
Eahora juliet[2024 upgraded] 48v 60ah peak 1200w electric bike for adults 100 200miles long range electric bicycles,20 * 4.