28 Aug 2024

Daikin Aircon Condo Installation at Eight Riversuites on 31 Jul 2024

  • Project location

    Eight Riversuites

  • Property type

    Condominium

Daikin aircon condo installation

Daikin Aircon Condo Installation

Condensing Unit (CU) Model: MKM75VVMGx 2

Fan Coil Unit (FCU) Model: CTKM25VVMG x 2, CTKM35VVMG x 2, CTKM50VVMG

Condo Daikin Aircon Installation Job Scopes:

  1. Supply of New Aircon, Refrigerant Pipe, and Fittings

Provision of two brand-new air conditioning systems, including all necessary refrigerant pipes and fittings, to ensure a seamless and durable installation that meets industry standards for optimal performance

Daikin Aircon Condo Installation - Supply of New Aircon, Refrigerant Pipe, and Fittings

  1. Dismantling

The Existing Aircon System Dismantling: The existing aircon system is carefully dismantled, including the safe disconnection of electrical connections and refrigerant lines.
Check the Existing Drainpipe: To ensure there will be no blocking of the existing drainpipes.

Daikin Aircon Condo Installation - Dismantling the existing CU Daikin Aircon Condo Installation - Dismantling Old Aircon System

  1. Preparation

Ceiling Cutting: To prepare for the new FCU location design as L-box, and to run the refrigerant pipes lines our technician precisely cuts the existing ceiling. This meticulous process ensures optimal placement and integration, maintaining the structural integrity and aesthetics of the ceiling.
Trunking Preparation: Trunking is installed to protect and neatly organize the refrigerant pipes, ensuring a clean and professional appearance.
Refrigerant Pipe Preparation: Refrigerant pipes are measured, cut, and prepared to fit the new location accurately.

Daikin Aircon Condo Installation -Trunking Preparation

  1. Reinstatement for the Ceiling

Our ceiling technician performs the ceiling reinstatement for the place to install the new FCUs. This ensures that the ceiling is in the desired condition with precision and care of your space.

Daikin Aircon Condo Installation - Ceiling Reinstatement

  1. Fan Coil Unit Installation

Wall-mounting the indoor aircon connects refrigerant and electrical lines, and ensures optimal performance and seamless integration.

Daikin Aircon Condo Installation - FCU-installation

  1. Refrigerant Pipe Installation

Insulation is applied to the refrigerant pipes to prevent energy loss and protect against temperature fluctuations, enhancing system efficiency and longevity. Use insulation tape and a gun for effective sealing and insulation.

Daikin Aircon Condo Installation -Refrigerant Pipe Installtion-2Aug2024

  1. Vacuuming the Refrigerant Pipes

Before connecting the refrigerant pipes from the indoor unit to the outdoor unit. The system must be vacuumed to remove any dust, debris, or contaminants from the refrigerant lines, ensuring a clean and efficient system.

Daikin Aircon Condo Installation - Vacuuming-2024-08-02-PM

  1. Condensing Unit Installation

The condensing unit is on the condo aircon ledge ensuring stability and correct alignment. After the CU installation, connect the refrigerator pipes between the indoor unit and the outdoor unit.

 Daikin Aircon Condo Installation - After Installation of Outdoor Unit - 2024-08-01-at-7.08

  1. Electrical Line Installation

Electrical Lines Installation: Our technician installs and connects electrical lines for two split-type aircon units. This includes wiring from the indoor units to the outdoor condenser, ensuring safe, efficient operation and compliance with EMA regulations.

  1. Testing and Final Inspection

Gas Leak Detection Test: A comprehensive test is conducted to detect any gas leaks, ensuring that all connections are secure, and the system operates safely.
Temperature Analysis: The system undergoes temperature analysis to verify efficient performance and accurate temperature levels.
A final inspection is performed to ensure compliance with HDB and BCA regulations, confirming that the installation meets all safety and technical standards.

 Daikin Aircon Condo Installation - CU1 Analysis - 2024-08-02 at 6.00.02 PM.jpeg  Daikin Aircon Condo Installation - TemperatureAnalysisCU1

  1. Cleaning the Workspace

The work area is thoroughly cleaned after installation to remove any debris or materials left behind, ensuring the space is tidy and free of hazards.

 

Our Aircon Services

System Analysis

Refrigerant renewal

Refrigerant pipe leak repair

Condenser Unit Alkaline Wash

Alkaline Wash with FCU Component Removal

Alkaline Wash without FCU Component Removal

FCU Essential Servicing

Condo Name: Fortune View

Read More About Us

Homeone Home Page

Homeone Aircon Page

Shop

Portfolio

Services

Blogs

About Us

Contact Us

Our Services

#Storage Water Heater

#Rheem

#Joven 

#Ariston 

#Gas Heater

#Paloma

#Ferroli

#Rinnai

#Aircon Services

Follow our Social Media

#FaceBook

#YouTube

 

 

Got A Question?

Feel free to reach out to us, if you have any enquiries

Log Out

Are you sure want to log out?
preloader
1000w electric bike for adults electric bicycles for men women 26″ fat tire electric mountain bike 48v 34mph 17.